Client: Timmons Gold Mine

Posted by in commercial energy featured, on June 08, 2013.

A turn-key stationary power system onsite.


20 year electric savings over $122,000,000.

20 Year Electric Savings: $122,504,534.85

The system designed by West Hills Construction consisted of a Solar Taurus 60 Mobile power unit configured to consistently produce a level output of 5.5MW of power regardless of temperature or atmospheric conditions.

20 Year Electric Savings: $122,504,534.85
Total Project Cost: $11,110,000.00
Debt: 50% Loan-To-Value (LTV)

20 Year Cash Flow Summary: $122,504,534.85
Time to Payback: 2.57 year

10 Year IRR: 68.17%
20 Year IRR: 72.11%